Bell Access & Engineering Ltd worked through out the pandemic to undertake slope stabilization works on behalf of Taziker industrial.
From the excavation of a top trench to encapsulate the head of the MatMatR erosion retention netting that covering and area of 3750m2, The Bell Access team installed approx. 400No. S6 Platiplus wire tendon anchors in an of set grid formation.
Framework: Network Rail Infrastructure
Client: Taziker Industrial
Duration: 8 Weeks