Foxash slope stabilisation

Bell Access & Engineering Ltd undertook slope stabilisation works at Foxash in Essex on behalf of Taziker Industrial. We utilised rope access techniques to access the worksite.

Maccaferri MacMatR erosion protection mesh was installed covering an area of 3750m². The Bell Access team installed approximately 400 Platipus S6 wire tendon anchors in an offset grid formation.

The mesh was secured at the crest and toe by excavating and backfilling a trench.

Fox-ash-slope-stabilisation

Project Details

Location: Foxash; Essex
Framework: Network Rail
Client: Taziker Industrial
Duration: 8 weeks